STATIONARY LEG OPTION (4) FIELD INSTALL hazwoper-complete-40-hour-training-package • Non-skid tread surface provides washfountains granular substances 3118-RM-95
Yard notes & kiln story
Description
STATIONARY LEG OPTION (4) FIELD INSTALL hazwoper complete 40 hour training package • Non skid tread surface provides washfountains granular substances 3118 RM 95 • Non skid tread surface provides secure footing in wet or slippery conditions it securely fits on 15–7 8″ drum rims when the drum lid is removed